Hi All,
I need to upgrade to the SPS05 of HANA and I'm following the Update Guide. Unfortunately my HANA Studio cannot connect to SUM.
If I logon to the HANA server I can see the SUM process running, but if I try to access the Lifecycle management from within the SAP HANA Studio (running on a separate windows server), I get the error: "Connection to host hanab1h and SID NDB cannot be established. Possible reason: network error occurred or Software Update Manager for SAP HANA is not running". The very helpful advice is to read the documentation..
Can anybody give me a push in the right direction? I can't find anything wrong with my configuration..
Tnx!
Sebastiaan
HDB version info:
version: 1.00.36.366896
branch: NewDB100_REL
git hash: not set
git merge time: not set
weekstone: 0000.00.0
compile date: 2012-08-31 19:08:15
compile host: ldm053.server
compile type: opt
HANA Studio 1.0.48